Chapter 10 Practice Paper: Data Analysis — Averages — mark scheme
QuizQuipPractice Series
QQ/S2MATH/CH10
Secondary 2 · Lower Secondary Mathematics (G2 / G3)
Mark scheme
Data Analysis — Averages
Chapter 10 Practice Paper · Maximum mark: 30
Notes for markers
- Award one mark for each point marked [1], up to the marks shown for the part.
- Accept answers worded differently that show the same understanding.
- Units are required where the answer line shows one. ecf: allow an error carried forward.
Section A: Multiple-choice questions[10 marks]
| Question | Answer | |
|---|---|---|
| 1 | BThe total is 24, and 24 ÷ 4 = 6. | 1 |
| 2 | AOrdered: 1, 3, 5, 7, 9 — the middle value is 5. | 1 |
| 3 | DThe value 4 occurs three times. | 1 |
| 4 | CTotal = mean × count = 15 × 8 = 120. | 1 |
| 5 | BAverage the middle pair: (14 + 16) ÷ 2 = 13. | 1 |
| 6 | AThe mean sums all values before dividing. | 1 |
| 7 | DEach leaf attaches to its stem: 35 and 38. | 1 |
| 8 | CTallest bar = highest frequency = modal class. | 1 |
| 9 | AA uniform shift moves the mean by the same amount. | 1 |
| 10 | BConsistency is about how tightly the scores pack together. | 1 |
Section B: Structured questions[20 marks]
| Question | Answer and marking points | Marks |
|---|---|---|
| 1(a) | 9 (it occurs three times) [1] | 1 |
| 1(b) | Ordered: 9, 9, 9, 11, 12, 15, 20 — the 4th of 7 values is 11.
| 2 |
| 1(c) | Total 85, so 85 ÷ 7 ≈ 12.14.
| 2 |
| Total for Question 1 | 5 | |
| 2(a) | 6 × 74 = 444 [1] | 1 |
| 2(b) | New total 7 × 75 = 525, so the 7th score is 525 − 444 = 81.
| 2 |
| 2(c) | (444 − 66) ÷ 5 = 378 ÷ 5 = 75.6.
| 2 |
| Total for Question 2 | 5 | |
| 3(a) | 5, 8, 12, 14, 14, 19, 21, 26.
| 1 |
| 3(b) | The 4th and 5th values are 14 and 14, so the median is 14.
| 2 |
| 3(c) | Total 119, so 119 ÷ 8 = 14.875 ≈ 14.9.
| 2 |
| Total for Question 3 | 5 | |
| 4(a) | 20 ≤ t < 30 minutes [1] | 1 |
| 4(b) | 18 + 12 = 30 [1] | 1 |
| 4(c) | Midpoints 5, 15, 25, 35: (6×5 + 14×15 + 18×25 + 12×35) ÷ 50 = 1110 ÷ 50 = 22.2 minutes.
| 3 |
| Total for Question 4 | 5 |
— End of mark scheme —